SAFETY & QUALITY

THE WORK ISN'T RIGHT IF IT ISN'T SAFE.

Double H integrates HSE planning and documented quality controls into field execution.

SAFETY PROGRAM

PLAN THE TASK.
CONTROL THE RISK.

Double H's safety handbook establishes requirements for employee and subcontractor orientation, daily tailgate HSE meetings, daily JSAs, communication, incident management, first aid/CPR availability, PPE, equipment inspection, emergency response, and other field programs.

Task and condition changes require hazards to be reassessed before work continues, and emergency/incident processes are established for the jobsite.

DOWNLOAD SAFETY HANDBOOK ↓

FIELD SAFETY

BUILT INTO THE WORK.

01

Orientation

Required HSE orientation before affected work activities begin.

02

Tailgate Meetings

Daily crew discussions covering the work, relevant JSAs, and changing conditions.

03

Job Safety Analysis

Task-specific hazards identified before work, with new JSAs when tasks or conditions change.

04

Emergency Readiness

Emergency contacts, first-aid resources, response procedures, and incident reporting established for the job.

QA/QC PROGRAM

PLAN. INSPECT. TEST. DOCUMENT.

The Double H QA/QC manual establishes a systematic process to plan, execute, inspect, test, document, and improve construction quality so work conforms to applicable project requirements.

Core controls include current approved documents, trained/qualified personnel, inspection and test planning, material/work traceability, calibrated measuring equipment, NCR management, corrective action, HDD quality controls, testing records, and complete turnover packages.

REQUEST QA/QC MANUAL →

QUALITY CONTROLS

VERIFY BEFORE ACCEPTANCE.

Document ControlUse current approved drawings, specifications, procedures, and forms.
TraceabilityMaintain material and work identifiers where required.
Inspection & TestingComplete required inspections, hold/witness points, and acceptance tests at the correct time.
NonconformanceIdentify, control, correct, reinspect/retest, and close deficiencies before acceptance.
TurnoverAssemble required final drawings, records, logs, certificates, test documents, photos, and closeout evidence.